1. | Asante Technologies Switch FM2008/2009 User Guide T ASAN E FriendlyNET FM2008 2009 SNMP Web Managed Switches User s Manual Quick Start Guide Follow these steps to install the switch 1 Open the box and check the contents See Chapter 1 for a complete list of the items included with the switch 2 Install the switch in an equipment or wall rack or prepare it for desktop placement 3 Connect the power supply 4 Connect network devices to the switch 5 Refer to Chapters 4 and 5 for configuration and |
![]() |